|
|
ORDERING PROCEDURE FOR CIVILIAN AGENCIES
G-FSS-920 ORDERING PROCEDURES FOR SERVICES (REQUIRING A STATEMENT OF WORK) (MAY 2000) (TAILORED)
FAR 8.402 contemplates that GSA may occasionally find it necessary to establish special ordering procedures for individual Federal Supply Schedules or for some Special Item Numbers (SINs) within a Schedule. GSA has established special ordering procedures for services that require a Statement of Work. These special ordering procedures take precedence over the procedures in FAR 8.404 (b)(2) through (b)(3).
GSA has determined that the prices for services contained in the contractor’s price list applicable to this Schedule are fair and reasonable. However, the ordering office using this contract is responsible for considering the level of effort and mix of labor proposed to perform a specific task being ordered and for making a determination that the total firm-fixed price or ceiling price is fair and reasonable.
- When ordering services, ordering offices shall—
- Prepare a Request (Request for Quote or other communication tool):
A statement of work (a performance-based statement of work is preferred) that outlines, at a minimum, the work to be performed, location of work, period of performance, deliverable schedule, applicable standards, acceptance criteria, and any special requirements (i.e., security clearances, travel, special knowledge, etc.) should be prepared.
- The request should include the statement of work and request the contractors to submit either a firm-fixed price or a ceiling price to provide the services outlined in the statement of work. A firm-fixed price order shall be requested, unless the ordering office makes a determination that it is not possible at the time of placing the order to estimate accurately the extent or duration of the work or to anticipate cost with any reasonable degree of confidence. When such a determination is made, a labor hour proposal may be requested. The firm-fixed price shall be based on the prices in the schedule contract and shall consider the mix of labor categories and level of effort required to perform the services described in the statement of work. The firm-fixed price of the order should also include any travel costs or other direct charges related to performance of the services ordered, unless the order provides for reimbursement of travel costs at the rates provided in the Federal Travel or Joint Travel Regulations. A ceiling price must be established for labor-hour orders.
- The request may ask the contractors, if necessary or appropriate, to submit a project plan for performing the task, and information on the contractor’s experience and/or past performance performing similar tasks.
- The request shall notify the contractors what basis will be used for selecting the contractor to receive the order. The notice shall include the basis for determining whether the contractors are technically qualified and provide an explanation regarding the intended use of any experience and/or past performance information in determining technical qualification of responses.
- Transmit the Request to Contractors:
- Based upon an initial evaluation of catalogs and price lists, the ordering office should identify the contractors that appear to offer the best value (considering the scope of services offered, pricing and other factors such as contractors’ locations, as appropriate).
- The request should be provided to three (3) contractors if the proposed order is estimated to exceed the micro-purchase threshold, but not exceed the maximum order threshold. For proposed orders exceeding the maximum order threshold, the request should be provided to additional contractors that offer services that will meet the agency’s needs. Ordering offices should strive to minimize the contractors’ costs associated with responding to requests for quotes for specific orders. Requests should be tailored to the minimum level necessary for adequate evaluation and selection for order placement. Oral presentations should be considered, when possible.
- Evaluate Responses and Select the Contractor to Receive the Order:
After responses have been evaluated against the factors identified in the request, the order should be placed with the schedule contractor that represents the best value. (See FAR 8.404)
- The establishment of Federal Supply Schedule Blanket Purchase Agreements (BPAs) for recurring services is permitted when the procedures outlined herein are followed. All BPAs for services must define the services that may be ordered under the BPA, along with delivery or performance time frames, billing procedures, etc. The potential volume of orders under BPAs, regardless of the size of individual orders, may offer the ordering office the opportunity to secure volume discounts. When establishing BPAs, ordering offices shall—
- (1) Inform contractors in the request (based on the agency’s requirement) if a single BPA or multiple BPAs will be established, and indicate the basis that will be used for selecting the contractors to be awarded the BPAs.
- (i) SINGLE BPA: Generally, a single BPA should be established when the ordering office can define the tasks to be ordered under the BPA and establish a firm-fixed price or ceiling price for individual tasks or services to be ordered. When this occurs, authorized users may place the order directly under the established BPA when the need for service arises. The schedule contractor that represents the best value should be awarded the BPA. (See FAR 8.404)
- MULTIPLE BPAs: When the ordering office determines multiple BPAs are needed to meet its requirements, the ordering office should determine which contractors can meet any technical qualifications before establishing the BPAs. When multiple BPAs are established, the authorized users must follow the procedures in (a)(2)(ii) above and then place the order with the Schedule contractor that represents the best value.
- Review BPAs Periodically: Such reviews shall be conducted at least annually. The purpose of the review is to determine whether the BPA still represents the best value. (See FAR 8.404)
- The ordering office should give preference to small business concerns when two or more contractors can provide the services at the same firm-fixed price or ceiling price.
- When the ordering office’s requirement involves both products as well as executive, administrative and/or professional, services, the ordering office should total the prices for the products and the firm-fixed price for the services and select the contractor that represents the best value. (See FAR 8.404)
- The ordering office, at a minimum, should document orders by identifying the contractor from which the services were purchased, the services purchased, and the amount paid. If other than a firm-fixed price order is placed, such documentation should include the basis for the determination to use a labor-hour order. For agency requirements in excess of the micro-purchase threshold, the order file should document the evaluation of Schedule contractors’ quotes that formed the basis for the selection of the contractor that received the order and the rationale for any trade-offs made in making the selection.
|